777 Franklin

Nine-story, 127,200 SF office building located on a small site at the corner of West Chicago Avenue and North Franklin Street directly adjacent to an active elevated transit line in Chicago, IL. The structural system for the project is a reinforced concrete frame consisting of columns and post-tensioned slabs supporting gravity loads and shear walls… Read More

Arlington Heights Army Reserve Center

This Army Reserve Center is comprised of three separate buildings: a two-story Training Center (70,877 SF), a one-story Organizational Maintenance Shop (4,944 SF), and a one-story Unheated Storage building (4,860 SF). Facilities include administrative, educational, assembly, weapons simulator, work bays, arms vault and supply areas for Army Reserve units and was won in a competitive… Read More

808Futsal

Hawaii’s first-ever Futsal facility, used for a modified form of soccer played on a smaller, indoor hard court with five players on each side. The 63,471 SF facility includes three international-standard Futsal courts, supporting facilities, a food court, and areas for spectators. One of the courts is elevated, providing covered parking and storage space underneath…. Read More

Art Van Furniture

A 60,000 SF prototype retail building for Art Van Furniture in Harwood Heights, IL. The building includes a 40,000 SF showroom, a 4,000 SF warehouse, and structural accommodations for an approximately 10,000 SF future expansion. The building is constructed of precast panel perimeter walls; structural steel, steel joist, and joist girder roof; and steel columns… Read More

Bachelor Enlisted Quarters P-469

This design-build project, won in a competitive procurement process, consists of a concrete, three-story, 140-room bachelor enlisted quarters measuring approximately 99,500 SF. The building is H-shaped and includes a covered passage between the new structure and the existing BEQ P-23. The structure was Guam’s first LEED Gold-certified building with energy efficient features such as a… Read More

C-17 Hangar

Competitive design-build of an aircraft hangar/nose dock and aircraft fuel system maintenance shop required to support the beddown of the C-17 mission at Hickam Air Force Base. The steel-framed building measures approximately 30,000 SF and is approximately 75 feet tall at the high point of the ridge. The exterior walls are comprised of a combination… Read More