BASE provided structural advisory services for this mixed-use retail, hospitality, and residential development that features two residential towers linked by a two level amenity “sky park” spanning between the top levels of the towers. The podium has a separate night club “box” and separate hotel/retail and residential parking areas. BASE worked with local steel suppliers… Read More
Structural design for a four-story, 23,000 SF transit-oriented development with rich character, constructed using a structural steel podium at the 2nd level that supports three levels of residential units framed with wood construction. There are 18 units on three floors with the first floor providing space for parking, mechanical/electrical rooms and approximately 2,800 SF of… Read More
This affordable housing project consists of 12 residential buildings that include 35 single-family units benefiting homeless and returning veterans. First floor units are designed for residents with mobility impairments and some of the units accommodate sensory impairments. The primary structural system consists of plywood sheathed wood shear walls, supporting wood floor trusses that typically clear… Read More
This 19-unit Hope Lodge offers no-cost housing to off-island residents undergoing cancer treatment in Honolulu. The 22,311 SF building is three stories with two occupied floors over a ground level floor of parking. With tight height restrictions at the site and the challenges of developing a small project, BASE worked with the team to create… Read More
Andaz Maui at Wailea Resort is a complete transformation of the former Renaissance Wailea Resort. The entire 15-acre oceanfront resort was renewed, including major reconstruction of the lobby building, renovations to all 297 guest rooms and suites, and complete landscaping improvements featuring four multiple cascading infinity pools. New additions to the resort include the construction… Read More
Nine-story, 127,200 SF office building located on a small site at the corner of West Chicago Avenue and North Franklin Street directly adjacent to an active elevated transit line in Chicago, IL. The structural system for the project is a reinforced concrete frame consisting of columns and post-tensioned slabs supporting gravity loads and shear walls… Read More
This Army Reserve Center is comprised of three separate buildings: a two-story Training Center (70,877 SF), a one-story Organizational Maintenance Shop (4,944 SF), and a one-story Unheated Storage building (4,860 SF). Facilities include administrative, educational, assembly, weapons simulator, work bays, arms vault and supply areas for Army Reserve units and was won in a competitive… Read More
Hawaii’s first-ever Futsal facility, used for a modified form of soccer played on a smaller, indoor hard court with five players on each side. The 63,471 SF facility includes three international-standard Futsal courts, supporting facilities, a food court, and areas for spectators. One of the courts is elevated, providing covered parking and storage space underneath…. Read More
A 60,000 SF prototype retail building for Art Van Furniture in Harwood Heights, IL. The building includes a 40,000 SF showroom, a 4,000 SF warehouse, and structural accommodations for an approximately 10,000 SF future expansion. The building is constructed of precast panel perimeter walls; structural steel, steel joist, and joist girder roof; and steel columns… Read More
This design-build project, won in a competitive procurement process, consists of a concrete, three-story, 140-room bachelor enlisted quarters measuring approximately 99,500 SF. The building is H-shaped and includes a covered passage between the new structure and the existing BEQ P-23. The structure was Guam’s first LEED Gold-certified building with energy efficient features such as a… Read More